Applications

The operating context defines the review.

SPPE suitability is assessed against the storage system, fuel, operating pattern, controls, safety duties, and jurisdiction.

Gasoline stations · Context: Underground and above-ground forecourt storage. Operational challenge: filling, withdrawal, storage conditions, access, existing vapour controls, and local requirements vary by site. Initial review and evaluation: capacity, throughput, delivery and withdrawal patterns, safety duties, jurisdiction, and a proportionate baseline or pilot plan. Caveat: suitability and expected performance require application-specific technical and jurisdictional assessment.

Discuss an SPPE application

Bulk storage and distribution · Context: Selected storage tanks, terminals, and distribution facilities. Operational challenge: tank service, loading regime, interfaces, inspection strategy, facility controls, and safety duties differ by facility. Initial review and evaluation: capacity, fuel, throughput, access, controls, regulatory requirements, and an appropriate validation plan. Caveat: suitability and expected performance require application-specific technical and jurisdictional assessment.

Discuss an SPPE application

Transport and mobile storage · Context: Selected tanker, fleet, vehicle-tank, and marine applications. Operational challenge: mobility, duty cycle, access, vibration, filling and withdrawal patterns, safety, and jurisdiction vary by use. Initial review and evaluation: operating conditions, capacity, controls, inspection and maintenance requirements, and an appropriate validation plan. Caveat: suitability and expected performance require application-specific technical and jurisdictional assessment.

Discuss an SPPE application

What an initial review needs

  • Organisation and country or jurisdiction
  • Application and storage type
  • Approximate capacity and throughput
  • Filling and withdrawal pattern
  • Existing vapour controls and operational objective

Begin with the operating context.

Share high-level application details for an initial technical and jurisdictional review.

Discuss an SPPE application